Germany Powerline Network Migration in ESRI ArcFM UT
- Documentation of EnBW Regional AG's medium voltage (MV), low voltage (LV), lighting and communication networks from multiple source formats into ESRI ArcFM GIS system
- Captured 6,500 km (3,900 Miles) of supply lines into GIS-based database - 60% of the cables were direct buried; the remaining lines were aerial lines
- Insertion of MV and LV power cable, splice, conduit, UST (substation), KVS (street distribution panel) and pole objects with full dimension details
- Redline updates, construction year analysis and recording, network connectivity tracing
|
 |